Paving Bed Calculator | Estimate Mortar and Sand for Slabs & Block Paving
Work out bedding mortar volume and split into cement bags & sand. Add waste and pick your mix.
Estimate Mortar & Sand for Slab or Paver
Use this guide to estimate bedding mortar for porcelain, sandstone, or block paving. It pairs with the Paving Bed Calculator for instant totals in cement bags, sand volume/tonnes, and a quick visual breakdown.
Formulas (Simple & Reliable)
Defaults: Cement density 1440 kg/m³, sharp sand 1600 kg/m³, common mixes 1:5 or 1:6 (cement:sand by volume).
Coverage per m² (by Bed Thickness)
Quick reference for a 1:5 bedding mortar:
| Bed Thickness | Mortar per m² (m³) | Cement (kg) per m² | 25 kg Bags per m² | Sand (m³) per m² | Sand (t) per m² |
|---|---|---|---|---|---|
| 30 mm (0.03 m) | 0.030 | 7.2 | 0.29 | 0.025 | 0.040 |
| 40 mm (0.04 m) | 0.040 | 9.6 | 0.38 | 0.033 | 0.053 |
| 50 mm (0.05 m) | 0.050 | 12.0 | 0.48 | 0.042 | 0.067 |
Worked Example
Patio: 20 m² at 40 mm bed, mix 1:5.
UK Price Guide (2025)
| Item | Typical Price (ex. VAT) | Notes |
|---|---|---|
| Cement 25 kg | £5.50 – £8.50 | Bulk deals lower cost. |
| Sharp Sand (bulk bag ~0.6 m³) | £40 – £70 | ~0.9–1.0 t; density varies by quarry. |
| Sharp Sand (loose per tonne) | £25 – £45 | Delivery + minimum order may apply. |
| Slurry Primer (porcelain) | £18 – £35 per tub | Boosts bond; follow data sheet. |
| Wacker Plate Hire | £25 – £45 / day | Weekend bundles available. |
Prices vary by region and supplier. Always confirm before ordering.
Tools & Materials (Affiliate)
- 25 kg Cement (multi-purpose)
- Sharp Sand — Bulk Bags
- Porcelain Slurry Primer
- Wacker Plate Compactor
- Screed Rails & Aluminium Straight Edge
Disclosure: Some links may be affiliate links that help support SmartBuildCalc at no extra cost to you.
Related Calculators
Frequently Asked Questions
What mortar mix for porcelain slabs?
Use a full bed with 1:5 or 1:6 cement:sharp sand and a suitable porcelain primer slurry on the slab backs.
How thick should the bedding be?
30–50 mm is typical. Go thicker to correct levels on uneven sub-bases. Always compact the sub-base first.
Can I add plasticiser?
Yes — it improves workability. Dose as per the product label; don’t exceed manufacturer guidance.
Do I need a geotextile membrane?
Recommended over weak or clay sub-grade to separate soil from the sub-base and reduce pumping.
Note: Figures are estimates for planning. Site conditions and slab manufacturer guidance should always take priority.