Render / Stucco Calculator

Render / Stucco Calculator

Render / Stucco Calculator

Rendering a wall or applying stucco? This calculator estimates how much material you'll need, including sand, cement, lime, and plasticiser. Suitable for UK render systems and USA stucco techniques.

Standard Thickness Guidelines

  • 🇬🇧 UK Render: 2-coat system (scratch + top coat), typically 10–15mm total thickness
  • 🇺🇸 USA Stucco: 3-coat system (scratch + brown + finish), usually 15–22mm total thickness
  • Finish textures: Smooth, dashed, roughcast, or trowelled — may slightly affect volume needed
  • Always apply in thin coats and allow proper curing between layers

Material Requirements (Based on 10–20mm Thickness)

Render Depth Wall Area Total Volume Cement Bags Sand (kg)
10mm10 m²0.10 m³6~700 kg
15mm10 m²0.15 m³9~1050 kg
20mm (USA 3-coat)10 m²0.20 m³12~1400 kg

Pro Tips

  • Pre-wet the wall before applying the scratch coat
  • Use corner beads and mesh for strength and edge straightness
  • Always overestimate slightly to allow for waste and rough surfaces

Common Mistakes

  • Applying too thick in one pass — leads to cracking and poor adhesion
  • Ignoring regional differences in base coat requirements
  • Not using lime or plasticiser — can result in stiff, unworkable render

FAQs

  • Can I use this for one-coat render systems? → Yes — just enter total wall area and 10–15mm thickness
  • Does USA stucco need lath? → Yes, metal lath or mesh is required over timber/OSB substrates
  • Do I need a curing period? → Yes — minimum 24–48h between coats; longer in cold or humid weather

Related Tools

render calculator, stucco material calculator, wall plaster estimator, cement sand lime render mix, stucco coverage USA, UK rendering mix ratio, 3 coat stucco materials, render per m2